Submit the report for data centers under the Energy Efficiency Directive

Attention : les démarches en ligne sur Mon Espace ne sont pas encore possibles à l'heure actuelle, de même que l'accès à certains formulaires PDF.

Summary

Data centers with an installed power demand of at least 500 kW are required to submit an annual report on energy efficiency through the European platform. The first deadline is set for September 15, 2024.

Key points

Check the FAQ regularly updated by the European Commission. Any access requests that do not meet the criteria will be frozen or rejected.

In detail

Conditions

Be a data center with an installed power demand of at least 500 kW.

Procedure
  • Access the reporting platform via this link.
  • Create an EU Login account if you don’t have one. You can consult the FAQ for more details.
  • Follow the steps described to submit your data.
  • During your first login, authorization will be requested from SPW to validate your access.
Délais

The first report must be submitted by September 15, 2024, and annually before May 15 thereafter.

Forms

Online

To download

Contacts

Updated on
Process n° : 4281