Summary
Data centers with an installed power demand of at least 500 kW are required to submit an annual report on energy efficiency through the European platform. The first deadline is set for September 15, 2024.
Key points
Check the FAQ regularly updated by the European Commission. Any access requests that do not meet the criteria will be frozen or rejected.
In detail
Conditions
Be a data center with an installed power demand of at least 500 kW.
Procedure
Délais
The first report must be submitted by September 15, 2024, and annually before May 15 thereafter.