Processes
Discover the processes available in English here, using the search tool or the available filters.

17 results found
- If you have invested in energy saving as part of a construction or expansion project, a portion of this investment can be deducted from your taxes.This deduction applies if the investment you have…
- Located at the heart of the motorway network, in Daussoulx, close to Namur, the PEREX centre monitors traffic and ensures the continuous operation of electronic and telecommunications equipment.…
- Waste electrical and electronic equipment (WEEE) is subject to mandatory reclamation. Recupel is responsible for organising channels for recycling this type of waste. As a buyer, the recycling fee…
- It is possible to reclaim your construction waste, such as excavated material, waste stone materials and other waste from the sector (asphalt, tarry, etc.) from civil-engineering sites, earthworks,…
- The Winter Plan for regional roads is in place between 15 October and 15 April every year. This plan is managed by the Road Action Unit (CAR). This comprises the Regional Crisis Centre (CRC-W), the…
- Some activities carried out by your company generate waste that you should transport from your client to a landfill, sorting centre, etc. For example, a kitchen designer who takes cardboard boxes and…